PND TransformersERP & CRM
MP
Manish PatelOwner/CEO
Avg Days per WO
18.4
Slowest Stage
Winding — 4.2d
Fastest Stage
Ele. Design — 1.1d
Average Days per Stage
Ele. Design
1.1d
Copper
2.8d
Core
3.1d
Mech Design
2.3d
Fabrication
3.5d
Colour
1.8d
Winding
4.2d
Assembly
2.5d
Tanking
1.9d
Testing
1.4d
Dispatch
0.5d
Work Order Breakdown
WO No.CustomerEle.DCuCoreMechFabColWindAsmTankTestDispTotal
PND/20637ABC Infrastructure1.22.532.13.41.742.321.50.423.1
PND/20798Rajkot Power Corp133.22.53.824.52.61.81.30.626.3
PND/20841Kutch Energy1.12.72.92.23.31.64.12.41.91.40.524.1
PND/20856Surat Textile1.32.83.12.33.51.84.22.521.60.525.6
PND/A039Bhavnagar Port12.62.8231.53.92.21.71.20.422.3
PND/20902Gujarat Gas1.22.93.32.43.61.94.32.72.11.50.526.4
PND/20913Mehsana GIDC0.92.52.71.93.11.63.82.31.61.10.422
PND/20924Vadodara Chem1.13.13.42.63.924.42.82.21.70.627.8

This layout is a template for all report pages — stat row + chart + detail table.