| Ticket No. | WO No. | Customer | Issue | Priority | Status | Assigned To | Follow-up | |
|---|---|---|---|---|---|---|---|---|
| SRV-0018 | PND/20637 | ABC Infrastructure Ltd | Oil leakage from top gasket | High | In Progress | VJVimal Joshi | 22 Aug 2026 | |
| SRV-0017 | PND/20798 | Rajkot Power Corp | Buchholz relay tripping false | Medium | Assigned | PKPradip Kahar | 20 Aug 2026 | |
| SRV-0016 | PND/20841 | Kutch Energy | Temperature rise above rated | High | Open | — | 18 Aug 2026 | |
| SRV-0015 | PND/20856 | Surat Textile | HV bushing cracked on LV side | High | Resolved | VJVimal Joshi | 10 Aug 2026 | |
| SRV-0014 | PND/A039 | Bhavnagar Port | OLTC operation jerky at position 3 | Medium | Closed | PKPradip Kahar | 5 Aug 2026 | |
| SRV-0013 | PND/20902 | Gujarat Gas | Oil level low after 3 months | Low | In Progress | VJVimal Joshi | 25 Aug 2026 | |
| SRV-0012 | PND/20913 | Mehsana GIDC | Earthing continuity failed test | Medium | Assigned | PKPradip Kahar | 28 Aug 2026 | |
| SRV-0011 | PND/20924 | Vadodara Chem | Noise from OLTC mechanism | Low | Open | — | 30 Aug 2026 |